Beaver Borough is excited to announce the renovations of the old pool house. The historic building will soon be an updated and modernized space for events, parties, meetings, and much more for the community to utilize. The final renovated space will be able to accommodate large gatherings inside and provide a beautiful outdoor venue. This is the first phase of the overall Shaw Park renovation project. Stay tuned for more updates!

 

The Shaw Park Project

The Shaw Park Project is a joint effort between Beaver Borough, Beaver County Foundation, and community members serving on the Shaw Park Committee.

Stay up to date, get involved, donate, and stay connected with the progress of the Shaw Park Project by visiting https://www.shawparkbeaver.org/


Pool Website and How to Make a Donation

September 16, 2021

Sign up for updates, and learn about the Pool Project:  Beaver Area Pool

Make a tax-deductible gift to the Water Complex at Shaw Park project fund through the Beaver County FoundationBeaver County Foundation


Friendly Reminder

June 1, 2021

Friendly reminder that the Beaver Pool and Splash Pad are permanently closed.


Beaver Pool & Shaw Park: Virtual Presentation

January 29, 2021

Due to COVID-19, a date at which we can safely meet to discuss the results of the Beaver Pool and Shaw Park survey and the three proposed design schemes is undetermined. We hope that we may be able to meet in the fall. In the meantime, as time is of the essence, Beaver Borough Manager Dan Madgar, Environmental Planning and Design, and Aquatic Facility Design have conducted a virtual presentation of the findings. The presentation can be watched below.

We’d like to give a special thank you to the Pool Committee for their hard work on this process:

Ward 1 – Frank Bovalino

Ward 2 – Alex Andres

Ward 3 – Adam Rathbun

 

Click here to download the PowerPoint presentation slides.

A 5 mill tax increase is being considered to fund the bond specifically for the pool. Borough Council will be voting on the proposed plans in the coming months.


Beaver Pool and Shaw Park: Proposed Designs Presentation

December 11, 2020

We’re pleased to inform you that Phase 1 of the Environmental Planning & Design (EPD) and Aquatic Facility Design (AFD) has been completed! Thank you to everyone who provided feedback through the Community Recreation Survey.

We’re looking forward to when we can safely have a public meeting to kick off Phase 2. In the meantime, we’d like to show you the results of the survey and the three proposed design schemes. Please take a look at them and begin to think of your questions or comments for the public meeting next year.

The meeting date will be announced on our website, Facebook page, and via email.


Message from Council President Regarding the Pool

June 1, 2020

We are pleased to inform our residents that council has approved Environmental Planning & Design (EPD) and Aquatic Facility Design (AFD) to complete Phase 1 of a 3 Phase program regarding the possible construction of a new pool.  Phase 1 will take approximate 4-6 weeks for a study to be completed. 

The purpose of Phase 1:  A report will be provided to council once EPD and AFD complete their study. Council will then discuss an acceptable budgetary range of the potential construction project, the potential funding/financing alternatives and construction time frame.  Once Council has reviewed the information, a public meeting will be scheduled which will be the beginning of Phase 2.

We ask that you continue to watch for updates on our website.

Your patience is appreciated.

Sean Snowden
Beaver Borough Council President


Message from Council President Regarding the Pool

March 2020

Dear Residents of Beaver,

On March 27, 2020, Aquatic Facility Design, Inc. and Environmental Planning and Design, LLC conducted a site inspection of the Beaver Borough swimming pool.  Borough representatives were present during the site inspection to provide assistance and to answer questions. On April 9, 2020, the above mentioned firms issued a “Facility Site Observation Condition Report” that documented the site inspection results and observations.  More specifically, the report provided detailed information to determine if it is reasonable to either refurbish the existing swimming pool or construct a new pool.   The report concluded that the pool needs to be closed and that refurbishing the pool is not an option.  Over the next several months, Beaver Borough Council members, Borough Manager and Borough Engineer will discuss our options.

Sincerely,
Sean Snowden
Beaver Borough Council President