We are pleased to inform our residents that council has approved Environmental Planning & Design (EPD) and Aquatic Facility Design (AFD) to complete Phase 1 of a 3 Phase program regarding the possible construction of a new pool.  Phase 1 will take approximate 4-6 weeks for a study to be completed. 

The purpose of Phase 1:  A report will be provided to council once EPD and AFD complete their study. Council will then discuss an acceptable budgetary range of the potential construction project, the potential funding/financing alternatives and construction time frame.  Once Council has reviewed the information, a public meeting will be scheduled which will be the beginning of Phase 2.

We ask that you continue to watch for updates on our website.

Your patience is appreciated.

Sean Snowden
Beaver Borough Council President

 

 

Dear Residents of Beaver,

On March 27, 2020, Aquatic Facility Design, Inc. and Environmental Planning and Design, LLC conducted a site inspection of the Beaver Borough swimming pool.  Borough representatives were present during the site inspection to provide assistance and to answer questions. On April 9, 2020, the above mentioned firms issued a “Facility Site Observation Condition Report” that documented the site inspection results and observations.  More specifically, the report provided detailed information to determine if it is reasonable to either refurbish the existing swimming pool or construct a new pool.   The report concluded that the pool needs to be closed and that refurbishing the pool is not an option.  Over the next several months, Beaver Borough Council members, Borough Manager and Borough Engineer will discuss our options.

Sincerely,
Sean Snowden
Beaver Borough Council President

2020 Beaver Pool Facility – Site Observation Conditions Report